Difference between revisions of "Installation and Integration/ActionItems"

From DUNE
Jump to navigation Jump to search
Line 25: Line 25:
  
 
===Ross Cage Design ===
 
===Ross Cage Design ===
Bill's proposal: [http://docs.dunescience.org:8080/cgi-bin/RetrieveFile?docid=1871&filename=Cage%20Parameters_FD_25OCT2016.pdf&version=1]
+
Bill's proposal: [http://docs.dunescience.org:8080/cgi-bin/RetrieveFile?docid=1871&filename=Cage%20Parameters_FD_25OCT2016.pdf&version=1 docdb entry]
  
 
=== Random information and questions ===
 
=== Random information and questions ===

Revision as of 13:22, 26 October 2016

Action Items for the Installation and Integration group

1. Cryostat design

List of the components using the TCO

  • -> Who?

Roof penetration locations

  • Detector support structure interference
  • -> Jack

Cable routing to the feedthroughs

  • -> Who?


Floor loading

  • -> Who?

2. Underground space

Plan for the work flow

Ross Cage Design

Bill's proposal: docdb entry

Random information and questions

  • If we make the cage tall enough to fit the APA crate inside, the excavation equipment for CF may not fit inside because the cage reduces maximum width by ~4” (100 mm) as compared to a slung load
  • Making the cage taller also makes it heavier, reducing the weight capacity for both slung and cage loads
  • Can we do to the Yates shaft for some items? Boundary conditions.