Difference between revisions of "Installation and Integration/ActionItems/Cables"

From DUNE
Jump to navigation Jump to search
Line 16: Line 16:
  
 
* '''Occupancy''': -> 3275.25mm<sup>2</sup>
 
* '''Occupancy''': -> 3275.25mm<sup>2</sup>
** PD: = '''1127.65mm<sup>2</sup>''' (PD head (18.5mmx18.5mm = 342.25mm<sup>2 </sup>) + 10 PD cables (10mm diameter) = 10 x 78.54mm<sup>2</sup> = 785.4mm<sup>2</sup> )
+
** PD: = '''785.4mm<sup>2</sup>''' = 10 PD cables (10mm diameter) = 10 x 78.54mm<sup>2</sup> = 785.4mm<sup>2</sup> ) NOTE: the PD head at 18.5mmx18.5mm = 342.25mm<sup>2 </sup> is not included here since it takes space only inside the tube and doesn't not go through the foot tube opening
 
**Support bar = 13mmx44mm = '''572mm<sup>2</sup>'''
 
**Support bar = 13mmx44mm = '''572mm<sup>2</sup>'''
 
** Potential CE cables (20 data cables + 20 LV cables): Data cables at 105.56mm<sup>2</sup>: Width=26mm, Thick=~4.06mm + LV cables at 52mm<sup>2</sup>: Width=26mm, Thick=~2.0mm
 
** Potential CE cables (20 data cables + 20 LV cables): Data cables at 105.56mm<sup>2</sup>: Width=26mm, Thick=~4.06mm + LV cables at 52mm<sup>2</sup>: Width=26mm, Thick=~2.0mm

Revision as of 10:37, 9 November 2016

Cable routing decision

There are currently two potential options:

1) Route the cables from the lower APA up "along" the upper APA frame.

2) Route the cables down to the floor of the cryostat all the way to the walls and up the walls.

Information on current status

APA Dimensions

  • APA opening dimensions (usable): 44mm x 63 mm = 2772mm2 (constrained by foot tube opening -> Cannot be larger to have enough space for glueing/soldering wires on the foot boards)

Actual dimensions: 70mm x 95mm = 6650mm2 (see below for drawings)

  • Occupancy: -> 3275.25mm2
    • PD: = 785.4mm2 = 10 PD cables (10mm diameter) = 10 x 78.54mm2 = 785.4mm2 ) NOTE: the PD head at 18.5mmx18.5mm = 342.25mm2 is not included here since it takes space only inside the tube and doesn't not go through the foot tube opening
    • Support bar = 13mmx44mm = 572mm2
    • Potential CE cables (20 data cables + 20 LV cables): Data cables at 105.56mm2: Width=26mm, Thick=~4.06mm + LV cables at 52mm2: Width=26mm, Thick=~2.0mm
    • If bundled 10 Data + 10 LV per APA side= 1575.6mm2


Drawings:

APA.png

Xsec.png

PD cables.jpeg PD Cables 2.jpeg

Cable size

  • PD cables (Cat6): 9-10 mm diameter + PD head (18.5mm x 18.5mm). 5 cables per APA -> 10 cables in upper APA
  • Cold cables: Max length = 25m (validated length for Gore), 20 CE cable pairs per APA (can they be split for each side of APA frame? -> 10 CE cable pairs per tube?)

-> CE cable pairs = blue data cables (26mm wide connector) + black-white LV cables (16mm wide connector) Cables.png

Cable routing plan for protoDUNE

Dimensions: 7m wide x 6m high Cable routing.png

Routing2.pngRouting1.png

Concerns and questions

  • How difficult is it to bring the cables up (in or on?) the APA frame? How long are the cables? What type of access we need to pass the cables through?
  • Are there any mechanical difficulties to pass the cables up the APA frame? Weight? Space?
  • Grounding and Shiedling: Can we bundle the cables together? Do we need mechanical/electrical separations in the APA frame?
  • If we go along the cryostat wall, we need longer cables. What is the impact of longer cables on readout? Procurement?
  • Is there anyway we can attached the cables on the cryostat wall? At the moment there is no mechanical device on the inner cryostat membrane. The space between APA and membrane is ~15cm. Need to take the weight of the cables into account in this design solution.

Group interface

  • Inst.& Int.: Roxanne, Bill, Marvin
  • APA: PSL (Lee and Dan) and Daresbury (Jo)
  • PD: David, Leon and Gary
  • CE: Matt

Potential testing sites

  • Ash River (contact: Bill)
  • Daresbury (contact: Jo)