==1. Cryostat design ==
 
==1. Cryostat design ==
  
 +
What is needed:
  
 +
# List of the components using the TCO
 +
 +
# Roof penetration locations
 +
Detector support structure interference
 +
: Jack
 +
# Floor loading
  
 
==2. Underground space  ==
 
==2. Underground space  ==

Revision as of 12:44, 26 October 2016

Action Items for the Installation and Integration group

1. Cryostat design

What is needed:

  1. List of the components using the TCO
  1. Roof penetration locations

Detector support structure interference

Jack
  1. Floor loading