Action Items for the Installation and Integration group
1. Cryostat design
What is needed:
List of the components using the TCO
- -> Who?
Roof penetration locations
- Detector support structure interference
- -> Jack
Cable routing to the feedthroughs
- -> Who?
Floor loading
- -> Who?