+ | * Inst.& Int.: Roxanne, Bill, Marvin | ||
* APA: PSL (Lee and Dan) and Daresbury (Jo) | * APA: PSL (Lee and Dan) and Daresbury (Jo) | ||
* PD: David, Leon and Gary | * PD: David, Leon and Gary | ||
* CE: Matt | * CE: Matt | ||
− | |||
== Potential testing sites== | == Potential testing sites== |
Revision as of 13:08, 7 November 2016
Contents
Cable routing decision
Information on current status
Concerns and questions
- How difficult is it to bring the cables up in the APA frame? How long are the cables? What type of access we need to pass the cables through?
- Are there any mechanical difficulties to pass the cables up the APA frame? Weight? Space?
- Grounding and Shiedling: Can we bundle the cables together? Do we need mechanical/electrical separations in the APA frame?
- If we go along the cryostat wall, we need longer cables. What is the impact of longer cables on readout? Procurement?
- Is there anyway we can attached the cables on the cryostat wall? At the moment there is no mechanical
Group interface
- Inst.& Int.: Roxanne, Bill, Marvin
- APA: PSL (Lee and Dan) and Daresbury (Jo)
- PD: David, Leon and Gary
- CE: Matt
Potential testing sites
- Ash River (contact: Bill)
- Daresbury (contact: Jo)