Difference between revisions of "Installation and Integration/ActionItems"

From DUNE
Jump to navigation Jump to search
Line 16: Line 16:
  
 
===Cable routing to the feedthroughs ===
 
===Cable routing to the feedthroughs ===
 +
*'''-> Who?'''
 +
  
 
===Floor loading===
 
===Floor loading===
 +
*'''-> Who?'''
  
 
==2. Underground space  ==
 
==2. Underground space  ==

Revision as of 12:50, 26 October 2016

Action Items for the Installation and Integration group

1. Cryostat design

What is needed:


List of the components using the TCO

  • -> Who?

Roof penetration locations

  • Detector support structure interference
  • -> Jack

Cable routing to the feedthroughs

  • -> Who?


Floor loading

  • -> Who?

2. Underground space