Difference between revisions of "Installation and Integration/ActionItems"
Jump to navigation
Jump to search
Line 16: | Line 16: | ||
===Cable routing to the feedthroughs === | ===Cable routing to the feedthroughs === | ||
+ | *'''-> Who?''' | ||
+ | |||
===Floor loading=== | ===Floor loading=== | ||
+ | *'''-> Who?''' | ||
==2. Underground space == | ==2. Underground space == |
Revision as of 12:50, 26 October 2016
Contents
Action Items for the Installation and Integration group
1. Cryostat design
What is needed:
List of the components using the TCO
- -> Who?
Roof penetration locations
- Detector support structure interference
- -> Jack
Cable routing to the feedthroughs
- -> Who?
Floor loading
- -> Who?