Difference between revisions of "Installation and Integration/ActionItems/Cables"
Jump to navigation
Jump to search
(Created page with "= Cable routing decision =") |
|||
Line 1: | Line 1: | ||
= Cable routing decision = | = Cable routing decision = | ||
+ | |||
+ | == Information on current status == | ||
+ | |||
+ | |||
+ | |||
+ | == Concerns and questions == | ||
+ | |||
+ | * How difficult is it to bring the cables up in the APA frame? How long are the cables? What type of access we need to pass the cables through? | ||
+ | |||
+ | * Are there any mechanical difficulties to pass the cables up the APA frame? Weight? Space? | ||
+ | |||
+ | * Grounding and Shiedling: Can we bundle the cables together? Do we need mechanical/electrical separations in the APA frame? | ||
+ | |||
+ | * If we go along the cryostat wall, we need longer cables. What is the impact of longer cables on readout? Procurement? | ||
+ | |||
+ | * Is there anyway we can attached the cables on the cryostat wall? At the moment there is no mechanical | ||
+ | |||
+ | == Group interface == | ||
+ | * APA: PSL (Lee and Dan) and Daresbury (Jo) | ||
+ | * PD: David, Leon and Gary | ||
+ | * CE: Matt | ||
+ | * Inst.& Int.: Roxanne, Bill, Marvin | ||
+ | |||
+ | == Potential testing sites== | ||
+ | |||
+ | * Ash River (contact: Bill) | ||
+ | * Daresbury (contact Jo) |
Revision as of 13:08, 7 November 2016
Contents
Cable routing decision
Information on current status
Concerns and questions
- How difficult is it to bring the cables up in the APA frame? How long are the cables? What type of access we need to pass the cables through?
- Are there any mechanical difficulties to pass the cables up the APA frame? Weight? Space?
- Grounding and Shiedling: Can we bundle the cables together? Do we need mechanical/electrical separations in the APA frame?
- If we go along the cryostat wall, we need longer cables. What is the impact of longer cables on readout? Procurement?
- Is there anyway we can attached the cables on the cryostat wall? At the moment there is no mechanical
Group interface
- APA: PSL (Lee and Dan) and Daresbury (Jo)
- PD: David, Leon and Gary
- CE: Matt
- Inst.& Int.: Roxanne, Bill, Marvin
Potential testing sites
- Ash River (contact: Bill)
- Daresbury (contact Jo)