Difference between revisions of "Installation and Integration/ActionItems/Cables"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
[[File:APA.png]] | [[File:APA.png]] | ||
[[File:xsec.png]] | [[File:xsec.png]] | ||
− | [[File:PD_cables. | + | [[File:PD_cables.jpeg]] |
[[Files: PD_Cables_2]] | [[Files: PD_Cables_2]] | ||
Revision as of 13:26, 7 November 2016
Contents
Cable routing decision
Information on current status
Drawings:
Concerns and questions
- How difficult is it to bring the cables up in the APA frame? How long are the cables? What type of access we need to pass the cables through?
- Are there any mechanical difficulties to pass the cables up the APA frame? Weight? Space?
- Grounding and Shiedling: Can we bundle the cables together? Do we need mechanical/electrical separations in the APA frame?
- If we go along the cryostat wall, we need longer cables. What is the impact of longer cables on readout? Procurement?
- Is there anyway we can attached the cables on the cryostat wall? At the moment there is no mechanical
Group interface
- Inst.& Int.: Roxanne, Bill, Marvin
- APA: PSL (Lee and Dan) and Daresbury (Jo)
- PD: David, Leon and Gary
- CE: Matt
Potential testing sites
- Ash River (contact: Bill)
- Daresbury (contact: Jo)