Difference between revisions of "Installation and Integration/ActionItems/Cables"

From DUNE
Jump to navigation Jump to search
Line 13: Line 13:
 
[[File:xsec.png]]
 
[[File:xsec.png]]
  
[[File:PD_cables.jpeg]]
+
[[File:PD_cables.jpeg | 600px]]
  
 
[[File: PD_Cables_2.jpeg |600px]]
 
[[File: PD_Cables_2.jpeg |600px]]

Revision as of 15:27, 7 November 2016

Cable routing decision

Information on current status

APA opening dimensions (usable): 44mm x 63 mm (constrained by foot opening -> Can it be larger?)

Actual dimensions: 70mm x 95mm (see below for drawings)

Drawings:

APA.png

Xsec.png

PD cables.jpeg

PD Cables 2.jpeg

Concerns and questions

  • How difficult is it to bring the cables up in the APA frame? How long are the cables? What type of access we need to pass the cables through?
  • Are there any mechanical difficulties to pass the cables up the APA frame? Weight? Space?
  • Grounding and Shiedling: Can we bundle the cables together? Do we need mechanical/electrical separations in the APA frame?
  • If we go along the cryostat wall, we need longer cables. What is the impact of longer cables on readout? Procurement?
  • Is there anyway we can attached the cables on the cryostat wall? At the moment there is no mechanical

Group interface

  • Inst.& Int.: Roxanne, Bill, Marvin
  • APA: PSL (Lee and Dan) and Daresbury (Jo)
  • PD: David, Leon and Gary
  • CE: Matt

Potential testing sites

  • Ash River (contact: Bill)
  • Daresbury (contact: Jo)