Difference between revisions of "Installation and Integration/ActionItems/Cables"

From DUNE
Jump to navigation Jump to search
Line 5: Line 5:
 
===APA Dimensions===
 
===APA Dimensions===
  
'''APA opening dimensions (usable): 44mm x 63 mm''' (constrained by foot opening -> Can it be larger?)
+
* '''APA opening dimensions (usable): 44mm x 63 mm = 2772mm^2''' (constrained by foot opening -> Cannot be larger to have enough space for glueing/soldering wires on the foot boards)
 
   
 
   
 
Actual dimensions: 70mm x 95mm (see below for drawings)
 
Actual dimensions: 70mm x 95mm (see below for drawings)
 +
 +
* '''Occupency''':
 +
** PD: PD head (18.5mmx18.5mm) + 10 PD cables (10mm diameter) =
  
 
'''Drawings''':
 
'''Drawings''':

Revision as of 16:17, 7 November 2016

Cable routing decision

Information on current status

APA Dimensions

  • APA opening dimensions (usable): 44mm x 63 mm = 2772mm^2 (constrained by foot opening -> Cannot be larger to have enough space for glueing/soldering wires on the foot boards)

Actual dimensions: 70mm x 95mm (see below for drawings)

  • Occupency:
    • PD: PD head (18.5mmx18.5mm) + 10 PD cables (10mm diameter) =

Drawings:

APA.png

Xsec.png

PD cables.jpeg

PD Cables 2.jpeg

Cable size

  • PD cables (Cat6): 9-10 mm diameter + PD head (18.5mm x 18.5mm). 5 cables per APA -> 10 cables in upper APA
  • Cold cables: Max length = 25m (validated length for Gore), 20 CE cable pairs per APA (can they be split for each side of APA frame? -> 10 CE cable pairs per tube?)

-> CE cable pairs = data cables (26mm) + LV cables (xxmm) Cables.png

Cable routing plan for protoDUNE

Dimensions: 7m wide x 6m high Cable routing.png

Routing2.pngRouting1.png

Concerns and questions

  • How difficult is it to bring the cables up (in or on?) the APA frame? How long are the cables? What type of access we need to pass the cables through?
  • Are there any mechanical difficulties to pass the cables up the APA frame? Weight? Space?
  • Grounding and Shiedling: Can we bundle the cables together? Do we need mechanical/electrical separations in the APA frame?
  • If we go along the cryostat wall, we need longer cables. What is the impact of longer cables on readout? Procurement?
  • Is there anyway we can attached the cables on the cryostat wall? At the moment there is no mechanical device on the inner cryostat membrane. The space between APA and membrane is ~15cm. Need to take the weight of the cables into account in this design solution.

Group interface

  • Inst.& Int.: Roxanne, Bill, Marvin
  • APA: PSL (Lee and Dan) and Daresbury (Jo)
  • PD: David, Leon and Gary
  • CE: Matt

Potential testing sites

  • Ash River (contact: Bill)
  • Daresbury (contact: Jo)