Action Items for the Installation and Integration group

1. Cryostat design

TCO interface

  • List of the components using the TCO
    • -> Where is the info?
    • -> Who?
  • TCO dimensions

Roof penetration locations

  • Detector support structure interference
  • -> Jack

Cable routing to the feedthroughs

  • -> Where is the info?
  • -> Who?

Floor loading

  • -> Where is the info?
  • -> Who?

2. Underground space

Plan for the work flow

  • -> Where is the info?
  • -> Who?

Ross Cage Design

Bill's proposal: docdb entry

  • -> Bill

Random information and questions

  • If we make the cage tall enough to fit the APA crate inside, the excavation equipment for CF may not fit inside because the cage reduces maximum width by ~4” (100 mm) as compared to a slung load
  • Making the cage taller also makes it heavier, reducing the weight capacity for both slung and cage loads
  • Can we do to the Yates shaft for some items? Boundary conditions.