Installation and Integration/ActionItems

From DUNE
Jump to navigation Jump to search

Action Items for the Installation and Integration group

1. Cryostat design

What is needed:

  1. List of the components using the TCO
  1. Roof penetration locations

Detector support structure interference

Jack
  1. Floor loading

2. Underground space