Installation and Integration/ActionItems

From DUNE
Jump to navigation Jump to search

Action Items for the Installation and Integration group

1. Cryostat design

What is needed:


List of the components using the TCO

  • -> Who?

Roof penetration locations

  • Detector support structure interference
  • -> Jack

Cable routing to the feedthroughs

  • -> Who?


Floor loading

  • -> Who?

2. Underground space