Difference between revisions of "Main Page"

From DUNE
Jump to navigation Jump to search
Line 71: Line 71:
 
== Run Plan ==
 
== Run Plan ==
  
08/09/2017
+
08/14/2017
  
 
* FE warm testing should continue with the A series ASICs on hothdaq2
 
* FE warm testing should continue with the A series ASICs on hothdaq2
* ADC cold single socket testing should continue with the D series ASICs on hothdaqs 4 &5
+
* ADC cold single socket testing should continue with the D series ASICs on hothdaqs 4 (vertical) & 5 (horizontal)
 
* Brian/Justin will be working on quad socket ADC development on hothdaq3
 
* Brian/Justin will be working on quad socket ADC development on hothdaq3
* Matt B will be testing CE boxes on hothdaq1
+
* Brian will be testing CE boxes on hothdaq1
 
* Oscillator and flash testing complete for now (big thank you to Jim for flash testing the past two days and to Arbin/Brian for getting the flash setup operational so quickly)
 
* Oscillator and flash testing complete for now (big thank you to Jim for flash testing the past two days and to Arbin/Brian for getting the flash setup operational so quickly)
  
Line 85: Line 85:
 
* [https://docs.google.com/spreadsheets/d/15a-QsJhyJppWninh5XQquv_DmerxDRAn_NDW2tmgj4c/edit#gid=957907399 Cold Electronics Shift Calendar]
 
* [https://docs.google.com/spreadsheets/d/15a-QsJhyJppWninh5XQquv_DmerxDRAn_NDW2tmgj4c/edit#gid=957907399 Cold Electronics Shift Calendar]
  
Please sign shifts in the above google calendar and notify Shift co-ordinators and Shift leaders by sending them email. New shifter needs to take required training, sign up the ESR (Experiment Safety Review) and take training before shift.
+
Please sign up for shifts in the above Google calendar and notify Quality Control co-ordinators and Shift Leaders by sending them email. New shifters need to take all the required training, read and sign the ESR (Experiment Safety Review) before shift.
  
 
== Required Training ==
 
== Required Training ==
  
Below are the training required to work on Cold Electronics Testing
+
Below are the training courses required to work on Cold Electronics Testing
  
 
* Cybersecurity (GE-CYBERSEC)
 
* Cybersecurity (GE-CYBERSEC)
 
* Physics department ALARA (PO-RADALARA-W)
 
* Physics department ALARA (PO-RADALARA-W)
 
* Cryogen Safety (HP-OSH-025)
 
* Cryogen Safety (HP-OSH-025)
In addition to these training, shifter needs to get BNL Domain Account (Windows) to sign up the ESR
 
  
*[https://www.bnl.gov/training/ Link to Training Page]
+
In addition to completing the above training courses, the shifter needs to get a BNL Domain Account (Windows) and review and sign the lab's Experimental Safety Review (ESR) PO-067-2016. When signing the ESR remember to only select the required training courses indicated above.
 +
 
 +
*[https://www.bnl.gov/training/ Link to BNL Training Page]
 
*[https://www.bnl.gov/accounts/ Link to request BNL Domain Account Online]
 
*[https://www.bnl.gov/accounts/ Link to request BNL Domain Account Online]
 
*[https://ias.bnl.gov/ESR/ Link to ESR]
 
*[https://ias.bnl.gov/ESR/ Link to ESR]
  
== Shift E-log ==
+
== Shift E-logs ==
  
*[https://docs.google.com/spreadsheets/d/1rtJYg5v41rcLxmTQlQDLlz46yUhW3eCRTdfQpMe2leg/edit#gid=0 Google Sheet E-log]
 
Every shifter is required to fill the above google sheet during shift. Select the appropriate shift as per your shift station (hothdaq1, hothdaq2, hothdaq3 ans so..on) and fill all the fields as listed in the sheet. Write proper and detailed description of the Run in the "Notes" column, for example, if run fails, give full description of error occurred at what testing stage.
 
  
*[https://elog-phy.bnl.gov/Cold+Electronics+General/page Shift Summary E-log]
+
*[https://docs.google.com/spreadsheets/d/1rtJYg5v41rcLxmTQlQDLlz46yUhW3eCRTdfQpMe2leg/edit#gid=0 Google Sheet Shifter E-log]
Shift leader is required to add daily shift summary at end of the shift in the above link. Along-with the shift summary, system experts should also add any changes occurring in testing code and releases etc. It is easy to get account in the e-log is anyone else interested.
+
 
 +
Every shifter is required to fill the above Google sheet for every test attempted during shift. Select the appropriate shift sheet as per your shift station (hothdaq1, hothdaq2, hothdaq3 ...etc) and fill all the fields as listed in the sheet. Write proper and detailed description of the Run in the "Notes" column, for example, if a run fails, give a concise description of the error that occurred and at what testing stage.
 +
 
 +
*[https://elog-phy.bnl.gov/Cold+Electronics+General/page Expert Cold Electronics E-log]
 +
 
 +
The shift leader is required to add a daily shift summary at end of the shift in the above link as well as any issues needing expert attention. Along-with the shift summary, system experts should also record changes occurring testing code, releases and bug fixes etc.
  
 
== Front-END ASIC Testing ==
 
== Front-END ASIC Testing ==
Shifter instructions on FE ASIC test procedure.
+
 
 +
Shifter instructions on the FE ASIC test procedure.
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/FE/ProtoDUNE_FE_ASIC_Test_Procedure.pdf FE ASIC Test Procedure]
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/FE/ProtoDUNE_FE_ASIC_Test_Procedure.pdf FE ASIC Test Procedure]
  
 
== ADC ASIC Testing ==
 
== ADC ASIC Testing ==
Shifter instructions on ADC ASIC test procedure.
+
Shifter instructions on the ADC ASIC cold test procedure:
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/ADC/ADC_Shift_Instructions.md ADC ASIC Test-stand Cold Test Shifter Instructions]
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/ADC/ADC_Shift_Instructions.md ADC ASIC Test-stand Cold Test Shifter Instructions]
Expert instructions on ADC ASIC test procedure
+
Expert instructions on ADC ASIC test procedures:
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/ADC/README.md ADC Test-stand Expert Documentation]
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/ADC/README.md ADC Test-stand Expert Documentation]
ADC ASIC Summary Plots (Accessible only within BNL)
+
ADC ASIC Summary Plots (Accessible only within BNL):
 
*[http://hothstor2.phy.bnl.gov/~arch/summary/adcasic-summary.html ADC ASIC Test Category Summary]
 
*[http://hothstor2.phy.bnl.gov/~arch/summary/adcasic-summary.html ADC ASIC Test Category Summary]
  
 
== Oscillator Testing ==
 
== Oscillator Testing ==
Shifter instructions on Oscillator test procedure.
+
Shifter instructions on Oscillator cold test procedures:
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/OscillatorTesting/README.md Oscillator Testing Instructions]
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/OscillatorTesting/README.md Oscillator Testing Instructions]
  
 
== Flash Memory Tester ==
 
== Flash Memory Tester ==
Shifter instructions on Flash memory test procedure.
+
Shifter instructions on Flash memory cold test procedures.
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/FlashTesting/FlashTestingInstructions.pdf Flash Memory Test Procedure]
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/FlashTesting/FlashTestingInstructions.pdf Flash Memory Test Procedure]
  
 
== Meetings ==
 
== Meetings ==
We have shift leaders meeting on every Monday at 9:00 am (EDT) and Wednesday at 8:30 am (EDT). This meeting is reserved for making daily Run plans and expert discussions.
+
We have a shift leaders meeting on every Monday at 9:00 am (EDT) and Wednesday at 8:30 am (EDT). This meeting is reserved for making daily run plans and expert discussions.
  
We have weekly meeting on CE Testing Status on Friday at 2:00 am (EDT). The link to indico page for these meetings is listed below
+
We have weekly meeting on CE Testing Status on Friday at 2:30 pm (EDT). The link to the indico page for these meetings is listed below
 
[https://indico.bnl.gov/categoryDisplay.py?categId=153 Cold Electronics Weekly Shift Mtg]
 
[https://indico.bnl.gov/categoryDisplay.py?categId=153 Cold Electronics Weekly Shift Mtg]
  
 
Sign-up for ce-teststands-l@lists.bnl.gov email list to get meeting notifications.
 
Sign-up for ce-teststands-l@lists.bnl.gov email list to get meeting notifications.

Revision as of 20:55, 17 August 2017

Welcome to the DUNE Wiki!

Getting Help

Questions or comments about this Wiki? Please write to Maxim and Brett (potekhin AT bnl.gov, bv AT bnl.gov). See the Help entry of the navigation bar on the left for more guidance about this wiki.

If you just joined DUNE, welcome aboard! Information for new members.

DUNE Institutions and people

Publications

Select publications by and about DUNE are collected in the Publications topic.

CERN

Useful CERN Links:

CERN Prototype

CERN Account Management

Once a membership is established, the account may be configured (e.g. one can create secondary and/or service accounts and apply for group membership at the CERN Account Management Page.

Detectors, Physics, planning, general interest

DUNE Far Detectors

Current and future prototypes

DUNE and its predecessor LBNE

Other Experiments

DUNE Computing

Please visit the DUNE Computing topic. Some direct links:


ProtoDUNE Cold Electronics Testing

Run Plan

08/14/2017

  • FE warm testing should continue with the A series ASICs on hothdaq2
  • ADC cold single socket testing should continue with the D series ASICs on hothdaqs 4 (vertical) & 5 (horizontal)
  • Brian/Justin will be working on quad socket ADC development on hothdaq3
  • Brian will be testing CE boxes on hothdaq1
  • Oscillator and flash testing complete for now (big thank you to Jim for flash testing the past two days and to Arbin/Brian for getting the flash setup operational so quickly)

If we run out of labeled A or D series ASICs, there are pens in the cabinet. Please self-certify as having good handwriting if you are going to label chips. I suggest doing no more than 50-100 at a time as handwriting deteriorates with fatigue.

Shift Sign-Up Calendar

Please sign up for shifts in the above Google calendar and notify Quality Control co-ordinators and Shift Leaders by sending them email. New shifters need to take all the required training, read and sign the ESR (Experiment Safety Review) before shift.

Required Training

Below are the training courses required to work on Cold Electronics Testing

  • Cybersecurity (GE-CYBERSEC)
  • Physics department ALARA (PO-RADALARA-W)
  • Cryogen Safety (HP-OSH-025)

In addition to completing the above training courses, the shifter needs to get a BNL Domain Account (Windows) and review and sign the lab's Experimental Safety Review (ESR) PO-067-2016. When signing the ESR remember to only select the required training courses indicated above.

Shift E-logs

Every shifter is required to fill the above Google sheet for every test attempted during shift. Select the appropriate shift sheet as per your shift station (hothdaq1, hothdaq2, hothdaq3 ...etc) and fill all the fields as listed in the sheet. Write proper and detailed description of the Run in the "Notes" column, for example, if a run fails, give a concise description of the error that occurred and at what testing stage.

The shift leader is required to add a daily shift summary at end of the shift in the above link as well as any issues needing expert attention. Along-with the shift summary, system experts should also record changes occurring testing code, releases and bug fixes etc.

Front-END ASIC Testing

Shifter instructions on the FE ASIC test procedure.

ADC ASIC Testing

Shifter instructions on the ADC ASIC cold test procedure:

Expert instructions on ADC ASIC test procedures:

ADC ASIC Summary Plots (Accessible only within BNL):

Oscillator Testing

Shifter instructions on Oscillator cold test procedures:

Flash Memory Tester

Shifter instructions on Flash memory cold test procedures.

Meetings

We have a shift leaders meeting on every Monday at 9:00 am (EDT) and Wednesday at 8:30 am (EDT). This meeting is reserved for making daily run plans and expert discussions.

We have weekly meeting on CE Testing Status on Friday at 2:30 pm (EDT). The link to the indico page for these meetings is listed below Cold Electronics Weekly Shift Mtg

Sign-up for ce-teststands-l@lists.bnl.gov email list to get meeting notifications.