Difference between revisions of "Main Page"
JyotiJoshi (talk | contribs) |
|||
Line 71: | Line 71: | ||
== Run Plan == | == Run Plan == | ||
− | 08/ | + | 08/14/2017 |
* FE warm testing should continue with the A series ASICs on hothdaq2 | * FE warm testing should continue with the A series ASICs on hothdaq2 | ||
− | * ADC cold single socket testing should continue with the D series ASICs on hothdaqs 4 &5 | + | * ADC cold single socket testing should continue with the D series ASICs on hothdaqs 4 (vertical) & 5 (horizontal) |
* Brian/Justin will be working on quad socket ADC development on hothdaq3 | * Brian/Justin will be working on quad socket ADC development on hothdaq3 | ||
− | * | + | * Brian will be testing CE boxes on hothdaq1 |
* Oscillator and flash testing complete for now (big thank you to Jim for flash testing the past two days and to Arbin/Brian for getting the flash setup operational so quickly) | * Oscillator and flash testing complete for now (big thank you to Jim for flash testing the past two days and to Arbin/Brian for getting the flash setup operational so quickly) | ||
Line 85: | Line 85: | ||
* [https://docs.google.com/spreadsheets/d/15a-QsJhyJppWninh5XQquv_DmerxDRAn_NDW2tmgj4c/edit#gid=957907399 Cold Electronics Shift Calendar] | * [https://docs.google.com/spreadsheets/d/15a-QsJhyJppWninh5XQquv_DmerxDRAn_NDW2tmgj4c/edit#gid=957907399 Cold Electronics Shift Calendar] | ||
− | Please sign shifts in the above | + | Please sign up for shifts in the above Google calendar and notify Quality Control co-ordinators and Shift Leaders by sending them email. New shifters need to take all the required training, read and sign the ESR (Experiment Safety Review) before shift. |
== Required Training == | == Required Training == | ||
− | Below are the training required to work on Cold Electronics Testing | + | Below are the training courses required to work on Cold Electronics Testing |
* Cybersecurity (GE-CYBERSEC) | * Cybersecurity (GE-CYBERSEC) | ||
* Physics department ALARA (PO-RADALARA-W) | * Physics department ALARA (PO-RADALARA-W) | ||
* Cryogen Safety (HP-OSH-025) | * Cryogen Safety (HP-OSH-025) | ||
− | |||
− | *[https://www.bnl.gov/training/ Link to Training Page] | + | In addition to completing the above training courses, the shifter needs to get a BNL Domain Account (Windows) and review and sign the lab's Experimental Safety Review (ESR) PO-067-2016. When signing the ESR remember to only select the required training courses indicated above. |
+ | |||
+ | *[https://www.bnl.gov/training/ Link to BNL Training Page] | ||
*[https://www.bnl.gov/accounts/ Link to request BNL Domain Account Online] | *[https://www.bnl.gov/accounts/ Link to request BNL Domain Account Online] | ||
*[https://ias.bnl.gov/ESR/ Link to ESR] | *[https://ias.bnl.gov/ESR/ Link to ESR] | ||
− | == Shift E- | + | == Shift E-logs == |
− | |||
− | |||
− | *[https://elog-phy.bnl.gov/Cold+Electronics+General/page | + | *[https://docs.google.com/spreadsheets/d/1rtJYg5v41rcLxmTQlQDLlz46yUhW3eCRTdfQpMe2leg/edit#gid=0 Google Sheet Shifter E-log] |
− | + | ||
+ | Every shifter is required to fill the above Google sheet for every test attempted during shift. Select the appropriate shift sheet as per your shift station (hothdaq1, hothdaq2, hothdaq3 ...etc) and fill all the fields as listed in the sheet. Write proper and detailed description of the Run in the "Notes" column, for example, if a run fails, give a concise description of the error that occurred and at what testing stage. | ||
+ | |||
+ | *[https://elog-phy.bnl.gov/Cold+Electronics+General/page Expert Cold Electronics E-log] | ||
+ | |||
+ | The shift leader is required to add a daily shift summary at end of the shift in the above link as well as any issues needing expert attention. Along-with the shift summary, system experts should also record changes occurring testing code, releases and bug fixes etc. | ||
== Front-END ASIC Testing == | == Front-END ASIC Testing == | ||
− | Shifter instructions on FE ASIC test procedure. | + | |
+ | Shifter instructions on the FE ASIC test procedure. | ||
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/FE/ProtoDUNE_FE_ASIC_Test_Procedure.pdf FE ASIC Test Procedure] | *[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/FE/ProtoDUNE_FE_ASIC_Test_Procedure.pdf FE ASIC Test Procedure] | ||
== ADC ASIC Testing == | == ADC ASIC Testing == | ||
− | Shifter instructions on ADC ASIC test procedure | + | Shifter instructions on the ADC ASIC cold test procedure: |
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/ADC/ADC_Shift_Instructions.md ADC ASIC Test-stand Cold Test Shifter Instructions] | *[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/ADC/ADC_Shift_Instructions.md ADC ASIC Test-stand Cold Test Shifter Instructions] | ||
− | Expert instructions on ADC ASIC test | + | Expert instructions on ADC ASIC test procedures: |
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/ADC/README.md ADC Test-stand Expert Documentation] | *[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/ADC/README.md ADC Test-stand Expert Documentation] | ||
− | ADC ASIC Summary Plots (Accessible only within BNL) | + | ADC ASIC Summary Plots (Accessible only within BNL): |
*[http://hothstor2.phy.bnl.gov/~arch/summary/adcasic-summary.html ADC ASIC Test Category Summary] | *[http://hothstor2.phy.bnl.gov/~arch/summary/adcasic-summary.html ADC ASIC Test Category Summary] | ||
== Oscillator Testing == | == Oscillator Testing == | ||
− | Shifter instructions on Oscillator test | + | Shifter instructions on Oscillator cold test procedures: |
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/OscillatorTesting/README.md Oscillator Testing Instructions] | *[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/OscillatorTesting/README.md Oscillator Testing Instructions] | ||
== Flash Memory Tester == | == Flash Memory Tester == | ||
− | Shifter instructions on Flash memory test | + | Shifter instructions on Flash memory cold test procedures. |
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/FlashTesting/FlashTestingInstructions.pdf Flash Memory Test Procedure] | *[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/FlashTesting/FlashTestingInstructions.pdf Flash Memory Test Procedure] | ||
== Meetings == | == Meetings == | ||
− | We have shift leaders meeting on every Monday at 9:00 am (EDT) and Wednesday at 8:30 am (EDT). This meeting is reserved for making daily | + | We have a shift leaders meeting on every Monday at 9:00 am (EDT) and Wednesday at 8:30 am (EDT). This meeting is reserved for making daily run plans and expert discussions. |
− | We have weekly meeting on CE Testing Status on Friday at 2: | + | We have weekly meeting on CE Testing Status on Friday at 2:30 pm (EDT). The link to the indico page for these meetings is listed below |
[https://indico.bnl.gov/categoryDisplay.py?categId=153 Cold Electronics Weekly Shift Mtg] | [https://indico.bnl.gov/categoryDisplay.py?categId=153 Cold Electronics Weekly Shift Mtg] | ||
Sign-up for ce-teststands-l@lists.bnl.gov email list to get meeting notifications. | Sign-up for ce-teststands-l@lists.bnl.gov email list to get meeting notifications. |
Revision as of 20:55, 17 August 2017
Contents
Welcome to the DUNE Wiki!
Getting Help
Questions or comments about this Wiki? Please write to Maxim and Brett (potekhin AT bnl.gov, bv AT bnl.gov). See the Help entry of the navigation bar on the left for more guidance about this wiki.
If you just joined DUNE, welcome aboard! Information for new members.
DUNE Institutions and people
- Main DUNE page
- Speakers' Committee
- Institution category (add your institution here)
- Collaboration Database
Publications
Select publications by and about DUNE are collected in the Publications topic.
CERN
Useful CERN Links:
- CERN Neutrino Platform
- CENF (CERN Neutrino Platform Work Pages)
- CERN Registration Procedure for new CENF members, which include CERN users (on site) and those who plan to access CERN computing facilities remotely
CERN Prototype
CERN Account Management
Once a membership is established, the account may be configured (e.g. one can create secondary and/or service accounts and apply for group membership at the CERN Account Management Page.
Detectors, Physics, planning, general interest
DUNE Far Detectors
Current and future prototypes
- 35t Liquid Argon Prototype (completed operations in 2016)
- CERN Prototypes (Single and Dual-Phase) (commissioning in 2017, data taking in 2018)
DUNE and its predecessor LBNE
- DUNE (formerly LBNE) in the news
- The Long-Baseline Neutrino Experiment: Exploring Fundamental Symmetries of the Universe
- P5 report
- Document Database at FNAL (a.k.a. DocDB). Password is required.
- http://lbne2-docdb.fnal.gov:8080/cgi-bin/DocumentDatabase LBNE (archive DB)
- http://docs.dunescience.org:8080/cgi-bin/DocumentDatabase DUNE (current DB)
- "Redmine". An integrated project and content management system used at FNAL (LBNE pages).
- DocDB 7463: ICARUS-LBNE Meetings and Documents.
- Data Volume and Rates (under construction)
Other Experiments
- INT Workshops (2010)
- MicroBooNE
- Intensity Frontier Experiments (Collection of IF Links)
- SHIP (proposed beam dump experiment at CERN SPS)
- FIFE - Fabric for Frontier Experiments. A project at FNAL aiming to implement collaborative and shared solutions, mainly for the Intensity Frontier Experiments.
- A Short-Baseline Experiment Proposal
DUNE Computing
Please visit the DUNE Computing topic. Some direct links:
ProtoDUNE Cold Electronics Testing
Run Plan
08/14/2017
- FE warm testing should continue with the A series ASICs on hothdaq2
- ADC cold single socket testing should continue with the D series ASICs on hothdaqs 4 (vertical) & 5 (horizontal)
- Brian/Justin will be working on quad socket ADC development on hothdaq3
- Brian will be testing CE boxes on hothdaq1
- Oscillator and flash testing complete for now (big thank you to Jim for flash testing the past two days and to Arbin/Brian for getting the flash setup operational so quickly)
If we run out of labeled A or D series ASICs, there are pens in the cabinet. Please self-certify as having good handwriting if you are going to label chips. I suggest doing no more than 50-100 at a time as handwriting deteriorates with fatigue.
Shift Sign-Up Calendar
Please sign up for shifts in the above Google calendar and notify Quality Control co-ordinators and Shift Leaders by sending them email. New shifters need to take all the required training, read and sign the ESR (Experiment Safety Review) before shift.
Required Training
Below are the training courses required to work on Cold Electronics Testing
- Cybersecurity (GE-CYBERSEC)
- Physics department ALARA (PO-RADALARA-W)
- Cryogen Safety (HP-OSH-025)
In addition to completing the above training courses, the shifter needs to get a BNL Domain Account (Windows) and review and sign the lab's Experimental Safety Review (ESR) PO-067-2016. When signing the ESR remember to only select the required training courses indicated above.
Shift E-logs
Every shifter is required to fill the above Google sheet for every test attempted during shift. Select the appropriate shift sheet as per your shift station (hothdaq1, hothdaq2, hothdaq3 ...etc) and fill all the fields as listed in the sheet. Write proper and detailed description of the Run in the "Notes" column, for example, if a run fails, give a concise description of the error that occurred and at what testing stage.
The shift leader is required to add a daily shift summary at end of the shift in the above link as well as any issues needing expert attention. Along-with the shift summary, system experts should also record changes occurring testing code, releases and bug fixes etc.
Front-END ASIC Testing
Shifter instructions on the FE ASIC test procedure.
ADC ASIC Testing
Shifter instructions on the ADC ASIC cold test procedure:
Expert instructions on ADC ASIC test procedures:
ADC ASIC Summary Plots (Accessible only within BNL):
Oscillator Testing
Shifter instructions on Oscillator cold test procedures:
Flash Memory Tester
Shifter instructions on Flash memory cold test procedures.
Meetings
We have a shift leaders meeting on every Monday at 9:00 am (EDT) and Wednesday at 8:30 am (EDT). This meeting is reserved for making daily run plans and expert discussions.
We have weekly meeting on CE Testing Status on Friday at 2:30 pm (EDT). The link to the indico page for these meetings is listed below Cold Electronics Weekly Shift Mtg
Sign-up for ce-teststands-l@lists.bnl.gov email list to get meeting notifications.