Difference between revisions of "Installation and Integration"
JimStewart (talk | contribs) |
JimStewart (talk | contribs) |
||
(35 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
=Integration and Installation= | =Integration and Installation= | ||
+ | |||
==Far Detector Integration== | ==Far Detector Integration== | ||
The interface between the Conventional Facilities and the cryogenic/cryostat with the Far Detector are a major component of the integration group for DUNE. | The interface between the Conventional Facilities and the cryogenic/cryostat with the Far Detector are a major component of the integration group for DUNE. | ||
− | |||
− | |||
− | + | ||
===Key Documents=== | ===Key Documents=== | ||
+ | * [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=136 100% Preliminary design for Buildings and Site Infrastructure and Excavation from Arup USA] | ||
+ | **BSI Preliminary Design Report (2015-08-24_BSI-100 Percent PDR.pdf, 12.6 MB) | ||
+ | **BSI Surface Design Drawings (Surface Binder.pdf, 16.0 MB) | ||
+ | **BSI Underground Drawings (Underground Binder.pdf, 34.2 MB) | ||
+ | **EXC Drawings (Excavation Drawings.pdf, 30.8 MB) | ||
+ | **EXC Preliminary Design Report (EXC_100_PDR Issue 0.pdf, 76.9 MB) | ||
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1489 LBNF BSI Pre-Excavation 60% Final Design Submission] | * [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1489 LBNF BSI Pre-Excavation 60% Final Design Submission] | ||
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=586 Comprehensive Logistics Plan] | * [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=586 Comprehensive Logistics Plan] | ||
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1490 LBNF EXC Pre-Excavation 60% Final Design Submission] | * [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1490 LBNF EXC Pre-Excavation 60% Final Design Submission] | ||
+ | * [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1832 LBNF BSI Pre-Excavation 90% Final Design Submission] | ||
+ | * [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1833 LBNF EXC Pre-Excavation 90% Final Design Submission] | ||
+ | * [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=2038 LBNF EXC Pre-Excavation 100% Final Design reports] | ||
+ | * [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=2039 LBNF EXC Pre-Excavation 100% Final Design Drawings] | ||
===Logistics=== | ===Logistics=== | ||
Line 19: | Line 28: | ||
The general plan for how materials will be transported to and within SURF is found in the SURF Logistics Assumptions document. | The general plan for how materials will be transported to and within SURF is found in the SURF Logistics Assumptions document. | ||
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=139 SURF Logistics Assumptions document] | * [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=139 SURF Logistics Assumptions document] | ||
+ | * [https://edms.cern.ch/document/2390576 Shipping manual] | ||
+ | * [https://edms.cern.ch/document/2698746 Cage Envelopes] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | Key documents and events related to the SURF logistics are: | |
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=586 Comprehensive Logistics Plan] | * [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=586 Comprehensive Logistics Plan] | ||
*[https://web.fnal.gov/project/LBNF/ReviewsAndAssessments/LBNF%20Logistics%20Planning%20Workshop/SitePages/Home.aspx Logistics Planning Workshop August 11-15 2015] | *[https://web.fnal.gov/project/LBNF/ReviewsAndAssessments/LBNF%20Logistics%20Planning%20Workshop/SitePages/Home.aspx Logistics Planning Workshop August 11-15 2015] | ||
Line 43: | Line 40: | ||
===Surface Facilities=== | ===Surface Facilities=== | ||
− | === | + | ===CUC DATA and Control room=== |
+ | * [https://docs.dunescience.org/cgi-bin/private/RetrieveFile?docid=937&filename=2016-03-02%20DUNE%20Control%20Room%20Requirements%20Report_Final.pdf&version=3 Control Room Workshop Report] | ||
+ | ===Ross/Yates Shaft Hoisting=== | ||
+ | |||
+ | The basic information related to hoisting is summarized in DOCDB 328 [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=328 Far Site Shaft Hoisting Assumptions and Parameters]. | ||
+ | |||
+ | Reference documents in DOCDB 328: | ||
+ | * Draft set of requirements for a new cage | ||
+ | **[http://docs.dunescience.org:8080/cgi-bin/RetrieveFile?docid=328&filename=Ross%20Cage%20Conveyance%20Requirements.pdf&version=5 Ross Cage Conveyance Requirements.pdf, 70.8 kB] | ||
+ | * Interface discussion presentation describing load delivery | ||
+ | **[http://docs.dunescience.org:8080/cgi-bin/RetrieveFile?docid=328&filename=Ross%20Shaft%20Logistics%20Overview.pptx&version=5 Ross Shaft Logistics Overview.pptx, 1.7 MB] | ||
+ | *List of Cryostat components and how to deliver through shaft | ||
+ | **[http://docs.dunescience.org:8080/cgi-bin/RetrieveFile?docid=328&filename=Analysis_of_CERN_Cryostat_Versus_Ross_Shaft_Limitations_17JAN16_MFJ.xls&version=5 Analysis_of_CERN_Cryostat_Versus_Ross_Shaft_Limitation...xls, 77.0 kB] | ||
+ | |||
+ | ===Underground facilities=== | ||
The far site conventional facilities is using the information from the Drift Study for referencing the maximum size objects that need to be accommodated by the surf infrastructure. | The far site conventional facilities is using the information from the Drift Study for referencing the maximum size objects that need to be accommodated by the surf infrastructure. | ||
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1313 Drift Size Optimization Study] | * [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1313 Drift Size Optimization Study] | ||
− | |||
− | |||
===Interface Management === | ===Interface Management === | ||
Line 71: | Line 80: | ||
===Material Handling === | ===Material Handling === | ||
+ | |||
+ | [[Image:Palift-photo.png|300px| manlift Palazzani]] | ||
Roof access is primarily necessary during electronics cabling and deployment of the FC panels. An areal platform will be used when work at heights is required. One possibility which was used quite successfully are the Palazzani Industrie platforms. | Roof access is primarily necessary during electronics cabling and deployment of the FC panels. An areal platform will be used when work at heights is required. One possibility which was used quite successfully are the Palazzani Industrie platforms. | ||
[http://www.palazzani.it/products/detail/23?lang=en Palazzani areal platforms] | [http://www.palazzani.it/products/detail/23?lang=en Palazzani areal platforms] | ||
− | [http://www.palazzani.it/public/TZX%20550%20(170)_USA100346.pdf Data Sheet for a small platform] | + | [http://www.palazzani.it/public/TZX%20550%20(170)_USA100346.pdf Data Sheet for a small platform (1m wide) areal lift] |
=Dual-Phase Far Detector Installation= | =Dual-Phase Far Detector Installation= | ||
=Miscellaneous= | =Miscellaneous= | ||
+ | |||
+ | [https://dune.bnl.gov/wiki/Installation_and_Integration/Underground_Views Underground Views] | ||
+ | |||
[https://edms.cern.ch/document/1493375/21 ENH1 Schedule] | [https://edms.cern.ch/document/1493375/21 ENH1 Schedule] | ||
=Navigation= | =Navigation= | ||
[https://web.fnal.gov/collaboration/DUNE/SitePages/FD%20Installation%20and%20Integration%20Working%20Group.aspx Back to Working group page] | [https://web.fnal.gov/collaboration/DUNE/SitePages/FD%20Installation%20and%20Integration%20Working%20Group.aspx Back to Working group page] | ||
+ | |||
+ | =Action items= | ||
+ | [https://dune.bnl.gov/wiki/Installation_and_Integration/ActionItems#2._Underground_space Action item page] | ||
+ | |||
+ | =Relevant meetings minutes= | ||
+ | [https://dune.bnl.gov/wiki/Installation_and_Integration/Meeting_G&S Grounding and Shielding meeting] |
Latest revision as of 13:08, 5 September 2022
Contents
Integration and Installation
Far Detector Integration
The interface between the Conventional Facilities and the cryogenic/cryostat with the Far Detector are a major component of the integration group for DUNE.
Key Documents
- 100% Preliminary design for Buildings and Site Infrastructure and Excavation from Arup USA
- BSI Preliminary Design Report (2015-08-24_BSI-100 Percent PDR.pdf, 12.6 MB)
- BSI Surface Design Drawings (Surface Binder.pdf, 16.0 MB)
- BSI Underground Drawings (Underground Binder.pdf, 34.2 MB)
- EXC Drawings (Excavation Drawings.pdf, 30.8 MB)
- EXC Preliminary Design Report (EXC_100_PDR Issue 0.pdf, 76.9 MB)
- LBNF BSI Pre-Excavation 60% Final Design Submission
- Comprehensive Logistics Plan
- LBNF EXC Pre-Excavation 60% Final Design Submission
- LBNF BSI Pre-Excavation 90% Final Design Submission
- LBNF EXC Pre-Excavation 90% Final Design Submission
- LBNF EXC Pre-Excavation 100% Final Design reports
- LBNF EXC Pre-Excavation 100% Final Design Drawings
Logistics
The general plan for how materials will be transported to and within SURF is found in the SURF Logistics Assumptions document.
Key documents and events related to the SURF logistics are:
Surface Facilities
CUC DATA and Control room
Ross/Yates Shaft Hoisting
The basic information related to hoisting is summarized in DOCDB 328 Far Site Shaft Hoisting Assumptions and Parameters.
Reference documents in DOCDB 328:
- Draft set of requirements for a new cage
- Interface discussion presentation describing load delivery
- List of Cryostat components and how to deliver through shaft
Underground facilities
The far site conventional facilities is using the information from the Drift Study for referencing the maximum size objects that need to be accommodated by the surf infrastructure.
Interface Management
The interfaces between Conventional Facilities and the Far Detector are documented through a series of Interface Control Documents that are agreed upon by both LBNF and DUNE. The ICDs themselves generally only identify the interface and then refer to a separate key document to describe and define the interface.
LBNF Systems Engineering webpage for interface management
Interface Control Documents
- CF Far Site Surface <--> Far Detector Design
- CF Far Site Shafts and Drifts <--> Far Detector Design
- CF Far Site Caverns <--> Far Detector Design
- CF Far Site Surface <--> Far Detector Construction
- CF Far Site Shafts and Drifts <--> Far Detector Construction
- CF Far Site Caverns <--> Far Detector Construction
Single-Phase Far Detector Installation
Cryostat internal installation
Material Handling
Roof access is primarily necessary during electronics cabling and deployment of the FC panels. An areal platform will be used when work at heights is required. One possibility which was used quite successfully are the Palazzani Industrie platforms. Palazzani areal platforms
Data Sheet for a small platform (1m wide) areal lift