Difference between revisions of "Installation and Integration"

From DUNE
Jump to navigation Jump to search
 
(30 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
=Integration and Installation=
 
=Integration and Installation=
 +
  
 
==Far Detector Integration==
 
==Far Detector Integration==
 
The interface between the Conventional Facilities and the cryogenic/cryostat with the Far Detector are a major component of the integration group for DUNE.
 
The interface between the Conventional Facilities and the cryogenic/cryostat with the Far Detector are a major component of the integration group for DUNE.
  
[[Image:CF-design-schedule.png |800px]]
 
  
The table of external milestones connected to the CF design process is listed below:
 
  
[[Image:InterfaceMilestones-CF-v2.png |400px]]
+
 
  
 
===Key Documents===
 
===Key Documents===
 +
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=136 100% Preliminary design for Buildings and Site Infrastructure and Excavation from Arup USA]
 +
**BSI Preliminary Design Report (2015-08-24_BSI-100 Percent PDR.pdf, 12.6 MB)
 +
**BSI Surface Design Drawings (Surface Binder.pdf, 16.0 MB)
 +
**BSI Underground Drawings (Underground Binder.pdf, 34.2 MB)
 +
**EXC Drawings (Excavation Drawings.pdf, 30.8 MB)
 +
**EXC Preliminary Design Report (EXC_100_PDR Issue 0.pdf, 76.9 MB)
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1489  LBNF BSI Pre-Excavation 60% Final Design Submission]
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1489  LBNF BSI Pre-Excavation 60% Final Design Submission]
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=586 Comprehensive Logistics Plan]
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=586 Comprehensive Logistics Plan]
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1490 LBNF EXC Pre-Excavation 60% Final Design Submission]
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1490 LBNF EXC Pre-Excavation 60% Final Design Submission]
 +
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1832 LBNF BSI Pre-Excavation 90% Final Design Submission]
 +
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1833 LBNF EXC Pre-Excavation 90% Final Design Submission]
 +
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=2038 LBNF EXC Pre-Excavation 100% Final Design reports]
 +
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=2039 LBNF EXC Pre-Excavation 100% Final Design Drawings]
  
 
===Logistics===
 
===Logistics===
Line 19: Line 28:
 
The general plan for how materials will be transported to and within SURF is found in the SURF Logistics Assumptions document.
 
The general plan for how materials will be transported to and within SURF is found in the SURF Logistics Assumptions document.
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=139 SURF Logistics Assumptions document]
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=139 SURF Logistics Assumptions document]
 +
* [https://edms.cern.ch/document/2390576 Shipping manual]
 +
* [https://edms.cern.ch/document/2698746 Cage Envelopes]
  
  
The [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=586 Comprehensive Logistics Plan] describes in some detail how the shaft usage will need to be planned. It also contains on page 9 the description of the detector needs which DUNE defined for the logistics study.
 
 
3.1.3 Time Projection Chambers
 
The cryostat time projection chamber (TPC; see Figure 6) comprises the following components:
 
* Anode Plane Assemblies (APAs) – 150 ea.  2.3m × 6.3m × 0.1m
 
** Four APAs per shipping container (see Figure 7)
 
** Estimated weight of 3,600kg per container
 
* Cathode Plane Assemblies (CPAs) – 200 ea.
 
** 2.3m × 3m (1400 m2)
 
** Four CPAs per shipping container
 
* Field cage (2,000m2)
 
* Readout electronics and racks – 75 ea.
 
* High V oltage (HV) system
 
The main elements are shipped in containers 1.3m × 2.8m × 7.3m (APA’s) and 0.5m × 2.5m × 3.8m (CPA’s) and 0.6m × 0.8m × 2.1m (racks). Most items will be configured in skid-size containers.
 
  
Other Key documents and events related to the SURF logistics are:
+
Key documents and events related to the SURF logistics are:
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=586 Comprehensive Logistics Plan]
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=586 Comprehensive Logistics Plan]
 
*[https://web.fnal.gov/project/LBNF/ReviewsAndAssessments/LBNF%20Logistics%20Planning%20Workshop/SitePages/Home.aspx Logistics Planning Workshop August 11-15 2015]
 
*[https://web.fnal.gov/project/LBNF/ReviewsAndAssessments/LBNF%20Logistics%20Planning%20Workshop/SitePages/Home.aspx Logistics Planning Workshop August 11-15 2015]
Line 43: Line 40:
 
===Surface Facilities===
 
===Surface Facilities===
  
===Ross Shaft===
+
===CUC DATA and Control room===
 +
* [https://docs.dunescience.org/cgi-bin/private/RetrieveFile?docid=937&filename=2016-03-02%20DUNE%20Control%20Room%20Requirements%20Report_Final.pdf&version=3 Control Room Workshop Report]
  
 +
===Ross/Yates  Shaft Hoisting===
 +
 +
The basic information related to hoisting is summarized in DOCDB 328 [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=328 Far Site Shaft Hoisting Assumptions and Parameters].
 +
 +
Reference documents in DOCDB 328:
 +
* Draft set of requirements for a new cage
 +
**[http://docs.dunescience.org:8080/cgi-bin/RetrieveFile?docid=328&filename=Ross%20Cage%20Conveyance%20Requirements.pdf&version=5 Ross Cage Conveyance Requirements.pdf, 70.8 kB]
 +
* Interface discussion presentation describing load delivery
 +
**[http://docs.dunescience.org:8080/cgi-bin/RetrieveFile?docid=328&filename=Ross%20Shaft%20Logistics%20Overview.pptx&version=5 Ross Shaft Logistics Overview.pptx, 1.7 MB]
 +
*List of Cryostat components and how to deliver through shaft
 +
**[http://docs.dunescience.org:8080/cgi-bin/RetrieveFile?docid=328&filename=Analysis_of_CERN_Cryostat_Versus_Ross_Shaft_Limitations_17JAN16_MFJ.xls&version=5 Analysis_of_CERN_Cryostat_Versus_Ross_Shaft_Limitation...xls, 77.0 kB]
 +
 +
===Underground facilities===
 
The far site conventional facilities is using the information from the Drift Study for referencing the maximum size objects that need to be accommodated by the surf infrastructure.
 
The far site conventional facilities is using the information from the Drift Study for referencing the maximum size objects that need to be accommodated by the surf infrastructure.
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1313 Drift Size Optimization Study]
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1313 Drift Size Optimization Study]
 
===Underground facilities===
 
  
 
===Interface Management ===
 
===Interface Management ===
Line 72: Line 81:
 
===Material Handling ===
 
===Material Handling ===
  
[[Image:Palift-photo.png|3oopx| manlift Palazzani]]
+
[[Image:Palift-photo.png|300px| manlift Palazzani]]
  
 
Roof access is primarily necessary during electronics cabling and deployment of the FC panels. An areal platform will be used when work at heights is required. One possibility which was used quite successfully are the Palazzani Industrie platforms.
 
Roof access is primarily necessary during electronics cabling and deployment of the FC panels. An areal platform will be used when work at heights is required. One possibility which was used quite successfully are the Palazzani Industrie platforms.
 
[http://www.palazzani.it/products/detail/23?lang=en Palazzani areal platforms]
 
[http://www.palazzani.it/products/detail/23?lang=en Palazzani areal platforms]
  
[http://www.palazzani.it/public/TZX%20550%20(170)_USA100346.pdf Data Sheet for a small platform]
+
[http://www.palazzani.it/public/TZX%20550%20(170)_USA100346.pdf Data Sheet for a small platform (1m wide) areal lift]
  
 
=Dual-Phase Far Detector Installation=
 
=Dual-Phase Far Detector Installation=
  
 
=Miscellaneous=
 
=Miscellaneous=
 +
 +
[https://dune.bnl.gov/wiki/Installation_and_Integration/Underground_Views Underground Views]
 +
 
[https://edms.cern.ch/document/1493375/21 ENH1 Schedule]
 
[https://edms.cern.ch/document/1493375/21 ENH1 Schedule]
  
 
=Navigation=
 
=Navigation=
 
[https://web.fnal.gov/collaboration/DUNE/SitePages/FD%20Installation%20and%20Integration%20Working%20Group.aspx Back to Working group page]
 
[https://web.fnal.gov/collaboration/DUNE/SitePages/FD%20Installation%20and%20Integration%20Working%20Group.aspx Back to Working group page]
 +
 +
=Action items=
 +
[https://dune.bnl.gov/wiki/Installation_and_Integration/ActionItems#2._Underground_space Action item page]
 +
 +
=Relevant meetings minutes=
 +
[https://dune.bnl.gov/wiki/Installation_and_Integration/Meeting_G&S Grounding and Shielding meeting]

Latest revision as of 13:08, 5 September 2022

Integration and Installation

Far Detector Integration

The interface between the Conventional Facilities and the cryogenic/cryostat with the Far Detector are a major component of the integration group for DUNE.



Key Documents

Logistics

The general plan for how materials will be transported to and within SURF is found in the SURF Logistics Assumptions document.


Key documents and events related to the SURF logistics are:

Surface Facilities

CUC DATA and Control room

Ross/Yates Shaft Hoisting

The basic information related to hoisting is summarized in DOCDB 328 Far Site Shaft Hoisting Assumptions and Parameters.

Reference documents in DOCDB 328:

Underground facilities

The far site conventional facilities is using the information from the Drift Study for referencing the maximum size objects that need to be accommodated by the surf infrastructure.

Interface Management

The interfaces between Conventional Facilities and the Far Detector are documented through a series of Interface Control Documents that are agreed upon by both LBNF and DUNE. The ICDs themselves generally only identify the interface and then refer to a separate key document to describe and define the interface.

LBNF Systems Engineering webpage for interface management

Screen Shot Sys-Eng-web.png

Interface Control Documents

Single-Phase Far Detector Installation

Cryostat internal installation

Material Handling

manlift Palazzani

Roof access is primarily necessary during electronics cabling and deployment of the FC panels. An areal platform will be used when work at heights is required. One possibility which was used quite successfully are the Palazzani Industrie platforms. Palazzani areal platforms

Data Sheet for a small platform (1m wide) areal lift

Dual-Phase Far Detector Installation

Miscellaneous

Underground Views

ENH1 Schedule

Navigation

Back to Working group page

Action items

Action item page

Relevant meetings minutes

Grounding and Shielding meeting