Difference between revisions of "Main Page"

From DUNE
Jump to navigation Jump to search
 
(40 intermediate revisions by 4 users not shown)
Line 1: Line 1:
= Welcome to the DUNE Wiki! =
+
= Welcome to the DUNE@BNL Wiki! =
== Getting Help ==
 
Questions or comments about this Wiki? Please write to
 
Maxim and Brett (potekhin ''AT'' bnl.gov, bv ''AT'' bnl.gov).
 
See the [[Help:Contents|Help entry]] of the navigation bar on
 
the left for more guidance about this wiki.
 
  
If you just joined DUNE, welcome aboard! [[Information for new members]].
+
The official DUNE wiki is at https://wiki.dunescience.org/ (login required). 
  
== DUNE Institutions and people ==
+
This wiki is intended to hold info relevant to BNL involvement in DUNE. Most questions regarding the content and design should be directed to Brett Viren and/or Maxim Potekhin.
 +
 
 +
= Institutions, people and publications =
 
* [http://www.dunescience.org/ Main DUNE page]
 
* [http://www.dunescience.org/ Main DUNE page]
 
* [https://web.fnal.gov/collaboration/DUNE/SitePages/Speakers%20Committee.aspx Speakers' Committee]
 
* [https://web.fnal.gov/collaboration/DUNE/SitePages/Speakers%20Committee.aspx Speakers' Committee]
 
* [[:Category:Institution|Institution category]] (add your institution [[Form:Institution|here]])
 
* [[:Category:Institution|Institution category]] (add your institution [[Form:Institution|here]])
 
* [https://dune.bnl.gov/people Collaboration Database]
 
* [https://dune.bnl.gov/people Collaboration Database]
 +
* [[Publications]] - select publications by and about DUNE
  
== Publications ==
+
= CERN =
 
 
Select publications by and about DUNE are collected in the [[Publications]] topic.
 
 
 
== CERN ==
 
=== Useful CERN Links: ===
 
 
* [http://home.cern/about/experiments/cern-neutrino-platform CERN Neutrino Platform]
 
* [http://home.cern/about/experiments/cern-neutrino-platform CERN Neutrino Platform]
 
* [http://cenf.web.cern.ch/ CENF] (CERN Neutrino Platform Work Pages)
 
* [http://cenf.web.cern.ch/ CENF] (CERN Neutrino Platform Work Pages)
 
* [http://cenf.web.cern.ch/basic/registration-procedure CERN Registration Procedure] for new CENF members, which include CERN users (on site) and those who plan to access CERN computing facilities remotely
 
* [http://cenf.web.cern.ch/basic/registration-procedure CERN Registration Procedure] for new CENF members, which include CERN users (on site) and those who plan to access CERN computing facilities remotely
 +
* [[CERN Prototype | *Archive* DUNE Far Detector prototypes at CERN (protoDUNE)]]
 +
* [https://account.cern.ch/account/ CERN Account Management Page] Once a membership is established, the account may be configured (e.g. one can create secondary and/or service accounts and apply for group membership)
  
=== CERN Prototype ===
+
= DUNE Far Detectors =
* [[CERN Prototype]]
 
 
 
=== CERN Account Management ===
 
Once a membership is established, the account may be configured (e.g. one can create secondary and/or service accounts and apply for group membership
 
at the [https://account.cern.ch/account/ CERN Account Management Page].
 
 
 
= Detectors, Physics, planning, general interest =
 
 
 
== DUNE Far Detectors ==
 
 
* [[Installation and Integration ]]
 
* [[Installation and Integration ]]
 
* [[SP - Cold Electronics]]
 
* [[SP - Cold Electronics]]
  
== Current and future prototypes ==
+
= ProtoDUNE Cold Electronics Testing =
 +
Materials kept on a separate page: [[protoDUNE CE test]]
 +
 
 +
= Archive and Reference =
 +
== DUNE prototypes ==
 
* [[35t_Test|35t Liquid Argon Prototype]] (completed operations in 2016)
 
* [[35t_Test|35t Liquid Argon Prototype]] (completed operations in 2016)
* [[CERN Prototype | CERN Prototypes (Single and Dual-Phase)]] (commissioning in 2017, data taking in 2018)
+
* [[CERN Prototype | CERN Prototypes (Single and Dual-Phase)]] (archive)
  
 
== DUNE and its predecessor LBNE ==
 
== DUNE and its predecessor LBNE ==
Line 51: Line 41:
 
* [https://cdcvs.fnal.gov/redmine/projects/lbne "Redmine"]. An integrated project and content management system used at FNAL (LBNE pages).
 
* [https://cdcvs.fnal.gov/redmine/projects/lbne "Redmine"]. An integrated project and content management system used at FNAL (LBNE pages).
 
* {{DocDB|7463|DocDB 7463}}: ICARUS-LBNE Meetings and Documents.
 
* {{DocDB|7463|DocDB 7463}}: ICARUS-LBNE Meetings and Documents.
* [https://lbne.bnl.gov/wiki/Data_Rates Data Volume and Rates] (under construction)
+
* [https://lbne.bnl.gov/wiki/Data_Rates Data Volume and Rates] (archive)
  
 
== Other Experiments ==
 
== Other Experiments ==
Line 60: Line 50:
 
* [https://sharepoint.fnal.gov/org/scd/fife/SitePages/Home.aspx FIFE - Fabric for Frontier Experiments]. A project at FNAL aiming to implement collaborative and shared solutions, mainly for the Intensity Frontier Experiments.
 
* [https://sharepoint.fnal.gov/org/scd/fife/SitePages/Home.aspx FIFE - Fabric for Frontier Experiments]. A project at FNAL aiming to implement collaborative and shared solutions, mainly for the Intensity Frontier Experiments.
 
* [http://arxiv.org/abs/1503.01520 A Short-Baseline Experiment Proposal]
 
* [http://arxiv.org/abs/1503.01520 A Short-Baseline Experiment Proposal]
 
== DUNE Computing ==
 
Please visit the [[DUNE Computing]] topic. Some direct links:
 
* [[LBNE_Geometry_Description_and_Model|Geometry]]
 
* [[DUNE_LAr_Software_Releases | LAr simulation and reconstruction SW for DUNE (dunetpc)]] ([[LBNE_Far_Detector_Software_Releases | lbnecode]])
 
 
 
= ProtoDUNE Cold Electronics Testing =
 
 
== Run Plan ==
 
 
08/09/2017
 
 
* FE warm testing should continue with the A series ASICs on hothdaq2
 
* ADC cold single socket testing should continue with the D series ASICs on hothdaqs 4 &5
 
* Brian/Justin will be working on quad socket ADC development on hothdaq3
 
* Matt B will be testing CE boxes on hothdaq1
 
* Oscillator and flash testing complete for now (big thank you to Jim for flash testing the past two days and to Arbin/Brian for getting the flash setup operational so quickly)
 
 
If we run out of labeled A or D series ASICs, there are pens in the cabinet. Please self-certify as having good handwriting if you are going to label chips. I suggest doing no more than 50-100 at a time as handwriting deteriorates with fatigue.
 
 
== Shift Sign-Up Calendar ==
 
 
* [https://docs.google.com/spreadsheets/d/15a-QsJhyJppWninh5XQquv_DmerxDRAn_NDW2tmgj4c/edit#gid=957907399 Cold Electronics Shift Calendar]
 
 
Please sign shifts in the above google calendar and notify Shift co-ordinators and Shift leaders by sending them email. New shifter needs to take required trainings, sign up the ESR (Experiment Safety Review) and take training before shift.
 
 
== Required Trainings ==
 
 
Below are the trainings required to work on Cold Electronics Testing
 
 
* Cybersecurity (GE-CYBERSEC)
 
* Physics department ALARA (PO-RADALARA-W)
 
* Cryogen Safety (HP-OSH-025)
 
In addition to these trainings, shifter needs to get BNL Domain Account (Windows) to sign up the ESR
 
 
*[https://www.bnl.gov/accounts/ Link to request BNL Domain Account Online]
 
*[https://ias.bnl.gov/ESR/ Link to ESR]
 
 
== Shift E-log ==
 
 
*[https://docs.google.com/spreadsheets/d/1rtJYg5v41rcLxmTQlQDLlz46yUhW3eCRTdfQpMe2leg/edit#gid=0 Google Sheet E-log]
 
Every shifter is required to fill the above google sheet during shift. Select the appropriate shift as per your shift station (hothdaq1, hothdaq2, hothdaq3 ans so..on) and fill all the fields as listed in the sheet. Write proper and detailed description of the Run in the "Notes" column, for example, if run fails, give full description of error occurred at what testing stage.
 
 
*[https://elog-phy.bnl.gov/Cold+Electronics+General/page Shift Summary E-log]
 
Shift leader is required to add daily shift summary at end of the shift in the above link. Along-with the shift summary, system experts should also add any changes occurring in testing code and releases etc. It is easy to get account in the e-log is anyone else interested.
 
 
== Front-END ASIC Testing ==
 
 
== ADC ASIC Testing ==
 
 
[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/ADC/ADC_Shift_Instructions.md ADC ASIC Test-stand Cold Test Shifter Instructions]
 
 
== Oscillator Testing ==
 
 
[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/OscillatorTesting/README.md Oscillator Testing Instructions]
 
 
== Flash Memory Tester ==
 
 
[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/FlashTesting/FlashTestingInstructions.pdf Flash Memory Test Procedure]
 

Latest revision as of 16:41, 21 December 2017

Welcome to the DUNE@BNL Wiki!

The official DUNE wiki is at https://wiki.dunescience.org/ (login required).

This wiki is intended to hold info relevant to BNL involvement in DUNE. Most questions regarding the content and design should be directed to Brett Viren and/or Maxim Potekhin.

Institutions, people and publications

CERN

DUNE Far Detectors

ProtoDUNE Cold Electronics Testing

Materials kept on a separate page: protoDUNE CE test

Archive and Reference

DUNE prototypes

DUNE and its predecessor LBNE

Other Experiments