Difference between revisions of "Installation and Integration"

From DUNE
Jump to navigation Jump to search
Line 6: Line 6:
  
 
===Key Documents===
 
===Key Documents===
* Installation
+
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1489  LBNF BSI Pre-Excavation 60% Final Design Submission]
  
 
===Logistics===
 
===Logistics===

Revision as of 15:11, 11 August 2016

Integration and Installation

Far Detector Integration

The interface between Conventional Facilities and the Far Detector The interfaces between Conventional Facilities and the Far Detector are documented through a series of Interface Control Documents that are agreed upon by both LBNF and DUNE. The ICDs themselves generally only identify the interface and then refer to a separate key document to describe and define the interface.

Key Documents

Logistics

Comprehensive Logistics Plan

LBNF BSI Pre-Excavation 60% Final Design Submission

Surface Facilities

Ross Shaft

Underground facilities

Single-Phase Far Detector Installation

Dual-Phase Far Detector Installation