Difference between revisions of "Installation and Integration"

From DUNE
Jump to navigation Jump to search
Line 16: Line 16:
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument Comprehensive Logistics Plan]
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument Comprehensive Logistics Plan]
 
*[https://web.fnal.gov/project/LBNF/ReviewsAndAssessments/LBNF%20Logistics%20Planning%20Workshop/SitePages/Home.aspx Logistics Planning Workshop August 11-15 2015]
 
*[https://web.fnal.gov/project/LBNF/ReviewsAndAssessments/LBNF%20Logistics%20Planning%20Workshop/SitePages/Home.aspx Logistics Planning Workshop August 11-15 2015]
** [http://docs.dunescience.org:8080/cgi-bin/ShowDocument Far Detector presentation and logistics equipment transport spreadsheet]
+
** [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=229 Far Detector presentation and logistics equipment transport spreadsheet]
  
 
===Surface Facilities===
 
===Surface Facilities===

Revision as of 19:36, 11 August 2016

Integration and Installation

Far Detector Integration

The interface between the Conventional Facilities and the cryogenic/cryostat with the Far Detector are a major component of the integration group for DUNE.

CF-design-schedule.png


Key Documents

Logistics

Surface Facilities

Ross Shaft

Underground facilities

Interface Management

The interfaces between Conventional Facilities and the Far Detector are documented through a series of Interface Control Documents that are agreed upon by both LBNF and DUNE. The ICDs themselves generally only identify the interface and then refer to a separate key document to describe and define the interface.

LBNF Systems Engineering webpage for interface management

Screen Shot Sys-Eng-web.png

Interface Control Documents

Single-Phase Far Detector Installation

Dual-Phase Far Detector Installation

Miscellaneous

ENH1 Schedule

Navigation

Back to Working group page