Difference between revisions of "Installation and Integration"
Jump to navigation
Jump to search
JimStewart (talk | contribs) |
JimStewart (talk | contribs) |
||
Line 9: | Line 9: | ||
===Logistics=== | ===Logistics=== | ||
+ | |||
+ | Comprehensive Logistics Plan | ||
+ | |||
+ | [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1489 LBNF BSI Pre-Excavation 60% Final Design Submission] | ||
===Surface Facilities=== | ===Surface Facilities=== |
Revision as of 15:10, 11 August 2016
Contents
Integration and Installation
Far Detector Integration
The interface between Conventional Facilities and the Far Detector The interfaces between Conventional Facilities and the Far Detector are documented through a series of Interface Control Documents that are agreed upon by both LBNF and DUNE. The ICDs themselves generally only identify the interface and then refer to a separate key document to describe and define the interface.
Key Documents
- Installation
Logistics
Comprehensive Logistics Plan
LBNF BSI Pre-Excavation 60% Final Design Submission