* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument Comprehensive Logistics Plan]
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument Comprehensive Logistics Plan]
 
http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1490
 
http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1490
 +
 +
[https://edms.cern.ch/document/1493375/21 ENH1 Schedule]
  
 
===Logistics===
 
===Logistics===

Revision as of 15:29, 11 August 2016

Integration and Installation

Far Detector Integration

The interface between the Conventional Facilities and the cryogenic/cryostat with the Far Detector are a major component of the integration group for DUNE.

The interfaces between Conventional Facilities and the Far Detector are documented through a series of Interface Control Documents that are agreed upon by both LBNF and DUNE. The ICDs themselves generally only identify the interface and then refer to a separate key document to describe and define the interface.

Key Documents

http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1490

ENH1 Schedule

Logistics

Surface Facilities

Ross Shaft

Underground facilities

Single-Phase Far Detector Installation

Dual-Phase Far Detector Installation