Difference between revisions of "Installation and Integration"
Jump to navigation
Jump to search
JimStewart (talk | contribs) |
JimStewart (talk | contribs) |
||
| Line 11: | Line 11: | ||
http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1490 | http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1490 | ||
| − | + | ||
===Logistics=== | ===Logistics=== | ||
| Line 26: | Line 26: | ||
==Dual-Phase Far Detector Installation== | ==Dual-Phase Far Detector Installation== | ||
| + | |||
| + | ==Miscellaneous== | ||
| + | [https://edms.cern.ch/document/1493375/21 ENH1 Schedule] | ||
Revision as of 15:59, 11 August 2016
Contents
Integration and Installation
Far Detector Integration
The interface between the Conventional Facilities and the cryogenic/cryostat with the Far Detector are a major component of the integration group for DUNE.
The interfaces between Conventional Facilities and the Far Detector are documented through a series of Interface Control Documents that are agreed upon by both LBNF and DUNE. The ICDs themselves generally only identify the interface and then refer to a separate key document to describe and define the interface.
Key Documents
http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1490