Difference between revisions of "Installation and Integration"
Jump to navigation
Jump to search
JimStewart (talk | contribs) |
JimStewart (talk | contribs) |
||
Line 27: | Line 27: | ||
[https://fermipoint.fnal.gov/project/LBNF/Project%20Office/Systems%20Engineering/SitePages/Interface%20Management.aspx LBNF Systems Engineering webpage for interface management ] | [https://fermipoint.fnal.gov/project/LBNF/Project%20Office/Systems%20Engineering/SitePages/Interface%20Management.aspx LBNF Systems Engineering webpage for interface management ] | ||
− | [[Image:Screen Shot Sys-Eng-web.png]] | + | [[Image:Screen Shot Sys-Eng-web.png |500px]] |
=Single-Phase Far Detector Installation= | =Single-Phase Far Detector Installation= |
Revision as of 16:32, 11 August 2016
Contents
Integration and Installation
Far Detector Integration
The interface between the Conventional Facilities and the cryogenic/cryostat with the Far Detector are a major component of the integration group for DUNE.
Key Documents
- LBNF BSI Pre-Excavation 60% Final Design Submission
- Comprehensive Logistics Plan
- LBNF EXC Pre-Excavation 60% Final Design Submission
Logistics
Surface Facilities
Ross Shaft
Underground facilities
Interface Management
The interfaces between Conventional Facilities and the Far Detector are documented through a series of Interface Control Documents that are agreed upon by both LBNF and DUNE. The ICDs themselves generally only identify the interface and then refer to a separate key document to describe and define the interface.
LBNF Systems Engineering webpage for interface management