Difference between revisions of "Installation and Integration"
Jump to navigation
Jump to search
JimStewart (talk | contribs) |
JimStewart (talk | contribs) |
||
Line 30: | Line 30: | ||
====Interface Control Documents==== | ====Interface Control Documents==== | ||
− | * | + | * CF Far Site Surface <--> Far Detector Design |
+ | * CF Far Site Shafts and Drifts <--> Far Detector Design | ||
+ | * CF Far Site Caverns <--> Far Detector Design | ||
+ | * CF Far Site Surface <--> Far Detector Construction | ||
+ | * CF Far Site Shafts and Drifts <--> Far Detector Construction | ||
+ | * CF Far Site Caverns <--> Far Detector Construction | ||
=Single-Phase Far Detector Installation= | =Single-Phase Far Detector Installation= |
Revision as of 16:40, 11 August 2016
Contents
Integration and Installation
Far Detector Integration
The interface between the Conventional Facilities and the cryogenic/cryostat with the Far Detector are a major component of the integration group for DUNE.
Key Documents
- LBNF BSI Pre-Excavation 60% Final Design Submission
- Comprehensive Logistics Plan
- LBNF EXC Pre-Excavation 60% Final Design Submission
Logistics
Surface Facilities
Ross Shaft
Underground facilities
Interface Management
The interfaces between Conventional Facilities and the Far Detector are documented through a series of Interface Control Documents that are agreed upon by both LBNF and DUNE. The ICDs themselves generally only identify the interface and then refer to a separate key document to describe and define the interface.
LBNF Systems Engineering webpage for interface management
Interface Control Documents
- CF Far Site Surface <--> Far Detector Design
- CF Far Site Shafts and Drifts <--> Far Detector Design
- CF Far Site Caverns <--> Far Detector Design
- CF Far Site Surface <--> Far Detector Construction
- CF Far Site Shafts and Drifts <--> Far Detector Construction
- CF Far Site Caverns <--> Far Detector Construction