The far site conventional facilities is using the information from the Drift Study for referencing the maximum size objects that need to be accommodated by the surf infrastructure.
 +
 +
http://docs.dunescience.org:8080/cgi-bin/RetrieveFile?docid=1313&filename=DriftStudy_07112016_Issue_2.pdf&version=2
  
 
===Underground facilities===
 
===Underground facilities===

Revision as of 14:23, 18 August 2016

Integration and Installation

Far Detector Integration

The interface between the Conventional Facilities and the cryogenic/cryostat with the Far Detector are a major component of the integration group for DUNE.

CF-design-schedule.png


Key Documents

Logistics

Surface Facilities

Ross Shaft

The far site conventional facilities is using the information from the Drift Study for referencing the maximum size objects that need to be accommodated by the surf infrastructure.

http://docs.dunescience.org:8080/cgi-bin/RetrieveFile?docid=1313&filename=DriftStudy_07112016_Issue_2.pdf&version=2

Underground facilities

Interface Management

The interfaces between Conventional Facilities and the Far Detector are documented through a series of Interface Control Documents that are agreed upon by both LBNF and DUNE. The ICDs themselves generally only identify the interface and then refer to a separate key document to describe and define the interface.

LBNF Systems Engineering webpage for interface management

Screen Shot Sys-Eng-web.png

Interface Control Documents

Single-Phase Far Detector Installation

Dual-Phase Far Detector Installation