Difference between revisions of "Installation and Integration"

From DUNE
Jump to navigation Jump to search
Line 12: Line 12:
 
===Key Documents===
 
===Key Documents===
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=136 100% Preliminary design for Buildings and Site Infrastructure and Excavation from Arup USA]
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=136 100% Preliminary design for Buildings and Site Infrastructure and Excavation from Arup USA]
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1489  LBNF BSI Pre-Excavation 60% Final Design Submission]
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=586 Comprehensive Logistics Plan]
 
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1490 LBNF EXC Pre-Excavation 60% Final Design Submission]
 
 
**BSI Preliminary Design Report (2015-08-24_BSI-100 Percent PDR.pdf, 12.6 MB)
 
**BSI Preliminary Design Report (2015-08-24_BSI-100 Percent PDR.pdf, 12.6 MB)
 
**BSI Surface Design Drawings (Surface Binder.pdf, 16.0 MB)
 
**BSI Surface Design Drawings (Surface Binder.pdf, 16.0 MB)
Line 20: Line 17:
 
**EXC Drawings (Excavation Drawings.pdf, 30.8 MB)
 
**EXC Drawings (Excavation Drawings.pdf, 30.8 MB)
 
**EXC Preliminary Design Report (EXC_100_PDR Issue 0.pdf, 76.9 MB)
 
**EXC Preliminary Design Report (EXC_100_PDR Issue 0.pdf, 76.9 MB)
 +
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1489  LBNF BSI Pre-Excavation 60% Final Design Submission]
 +
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=586 Comprehensive Logistics Plan]
 +
* [http://docs.dunescience.org:8080/cgi-bin/ShowDocument?docid=1490 LBNF EXC Pre-Excavation 60% Final Design Submission]
  
 
===Logistics===
 
===Logistics===

Revision as of 20:07, 13 October 2016

Integration and Installation

Far Detector Integration

The interface between the Conventional Facilities and the cryogenic/cryostat with the Far Detector are a major component of the integration group for DUNE.

CF-design-schedule.png

The table of external milestones connected to the CF design process is listed below:

InterfaceMilestones-CF-v2.png

Key Documents

Logistics

The general plan for how materials will be transported to and within SURF is found in the SURF Logistics Assumptions document.


The Comprehensive Logistics Plan describes in some detail how the shaft usage will need to be planned. It also contains on page 9 the description of the detector needs which DUNE defined for the logistics study.

3.1.3 Time Projection Chambers The cryostat time projection chamber (TPC; see Figure 6) comprises the following components:

  •  Anode Plane Assemblies (APAs) – 150 ea.  2.3m × 6.3m × 0.1m
    •  Four APAs per shipping container (see Figure 7)
    •  Estimated weight of 3,600kg per container
  •  Cathode Plane Assemblies (CPAs) – 200 ea.
    •  2.3m × 3m (1400 m2)
    •  Four CPAs per shipping container
  •  Field cage (2,000m2)
  •  Readout electronics and racks – 75 ea.
  •  High V oltage (HV) system

The main elements are shipped in containers 1.3m × 2.8m × 7.3m (APA’s) and 0.5m × 2.5m × 3.8m (CPA’s) and 0.6m × 0.8m × 2.1m (racks). Most items will be configured in skid-size containers.

Other Key documents and events related to the SURF logistics are:

Surface Facilities

Ross/Yates Shaft Hoisting

The basic information related to hoisting is summarized in DOCDB 328 Far Site Shaft Hoisting Assumptions and Parameters.

Reference documents in DOCDB 328:

Underground facilities

The far site conventional facilities is using the information from the Drift Study for referencing the maximum size objects that need to be accommodated by the surf infrastructure.

Interface Management

The interfaces between Conventional Facilities and the Far Detector are documented through a series of Interface Control Documents that are agreed upon by both LBNF and DUNE. The ICDs themselves generally only identify the interface and then refer to a separate key document to describe and define the interface.

LBNF Systems Engineering webpage for interface management

Screen Shot Sys-Eng-web.png

Interface Control Documents

Single-Phase Far Detector Installation

Cryostat internal installation

Material Handling

manlift Palazzani

Roof access is primarily necessary during electronics cabling and deployment of the FC panels. An areal platform will be used when work at heights is required. One possibility which was used quite successfully are the Palazzani Industrie platforms. Palazzani areal platforms

Data Sheet for a small platform

Dual-Phase Far Detector Installation

Miscellaneous

ENH1 Schedule

Navigation

Back to Working group page